Granville Community Calendar

Bryn Du Minutes July 28, 2010

BRYN DU COMMISSION

REGULAR MEETING MINUTES OF WEDNESDAY, JULY 28, 2010

  

Members present:

Larry Bicking, Reed Fraley, erb, HHhhhh   Candi Moore, Jurgen Pape,

Bruce Cramer, Exec. Dir.

Guests present:

Steve Mershon (part-time)

Minutes:

Larry moved and Reed seconded to approve the amended minutes of 4/28/10; approval was unanimous.

Jurgen moved and Reed seconded to approve the minutes of 6/23/10; approval was unanimous.

Larry moved and Jurgen seconded the minutes of the special meeting on 7/7/10; approval was unanimous.

Financial Report:

Reed handed out his latest financial report, dated June 30, 2010. Reed summarized some items and mentioned a more favorable rate for one of the overlapping CDs and substantial increases in rental fees. The IRS form 990 was filed on time.

Jurgen moved and Larry seconded to receive the financial report; acceptance was unanimous.

Executive Director Report

Bruce highlighted items in his latest report (attached).

Bruce showed the new logo to be used for all occasions. Candi suggested to get permanent board member tags with this logo.

Repair and maintenance schedule is pretty well on track including painting and roof repair.

Old Business;

Bruce handed out a draft statement about the lawn parking. We need to get more control over parking and limit driving on grass. Some potential input was discussed including charging for parking but it was decided to table this issue to allow absent board members’ input and for Bruce to revise some parts.

The formal garden area is scheduled to be planted next week. Bruce will send a brief update to the Granville Foundation since they contributed to this project.

Steve Mershon discussed the Vets Memorial area and handed out a draft flyer to entice donors to contribute to this project. Donations will be requested for the base area and for individual trees; donors will probably be listed in a registry. A tree donation will include some form of maintenance to go into a Vets Memorial area general fund. Jurgen promised to send details about this to Steve.

Discussion ensued about the parking lot between the Carriage, Terrace and Studio buildings. Jurgen reported the engineer’s points about some unknown underground utilities to be investigated as part of the engineering drawings to be prepared for bids. The members preferred to proceed with the original design and develop the required drawings; this may delay completion of the drawings. We apparently only made a verbal promise to GSVA to provide paved access to the Terrace House. The value of a temporary or limited access lane was discussed.

Candi reported no news about the senior center building

The next regular meeting is scheduled for August 25, 2010.  

The meeting was adjourned at 10 PM.  

Employee Payroll / Compensation

The Village has thirty-six (36) full-time employees, 16 regular part-time employees and seaonal employees. Village Personnel Policy

Go to My Pay Stub and login.